Skip to main content
Last updated: March 2026

IntelliShares Investor Deck

Last Updated: 2026-02-01 Version: 1.0 Owner: Marketing / Business Development


Slide 1: Title & Thesis

IntelliShares SA

One-liner:

We build the world's first borderless green asset ecosystem, democratizing ownership and returns where financial and CO₂ impact is greatest.

Framing for SAFT (Simple Agreement for Future Tokens) participants:

  • Cyclical token economy: INT funds assets → assets sell as RWA → RWA purchases require INT
  • Demand tied to real infrastructure, not speculation
  • First-mover advantage in tokenized green infrastructure

Key Points for INT Participants

  • We build and operate solar and battery systems behind the meter, achieving ~400% better revenue compared with grid-connected farms
  • We focus on high CO2/kWh regions for maximum emissions reduction per green kWh produced (~8 €cent/kWh in CO2 credits)
  • We deploy on existing grid connections, saving time and cost

Slide 2: The Problem

519 GWp of EU C&I rooftop potential—plus substantial multi-residential—sits empty while capital flows to regions where each kWh reduces the least CO₂.

The EU has 2.3 TWp of total rooftop potential: 519 GWp on commercial & industrial buildings, plus 1,822 GWp residential (including large multi-family buildings). Only 10% of European rooftops have solar today. C&I alone could meet 50–95% of member states' PV targets—yet utility-scale takes 42% of new installations while C&I captures just 39%.

Three Core Problems

1. Split-Incentive & Funding

Building owners won't invest when tenants consume the energy—either tenants hold the grid connection, or energy costs pass through to them directly. Either way, owners can't capture the value. Tenants won't invest in hardware locked to a roof they don't own—they need flexibility to move, and it's not their roof to access. And millions of Europeans in apartments want to invest in solar but have no roof at all.

Traditional finance can't solve this—projects are too small for infrastructure funds, too large for consumer financing, and property owners don't want solar on their balance sheets.

2. Geographic Capital Mismatch

Capital flows to already-clean grids—stable regulation, familiar markets, lower perceived risk—while high-carbon regions stay underfunded.

RegionGrid Emissionsvs. Sweden
Sweden7 gCO₂e/kWh1× (baseline)
Switzerland35 gCO₂e/kWh5×
EU-27 Average187 gCO₂e/kWh27×
Germany298 gCO₂e/kWh43×
Cyprus535 gCO₂e/kWh76×
Poland554 gCO₂e/kWh79×
Estonia585 gCO₂e/kWh84×

The same panel in Estonia reduces 84× more emissions than in Sweden—but capital stays in familiar markets.

3. Wholesale vs. Retail Price Gap

Solar farms, often built on farmland, sell at wholesale prices (€40–120/MWh), while consumers pay retail prices 2–4× higher. Behind-the-meter captures the retail price—that's where the 400% better economics come from.

ComponentSwedenPolandItalyCyprusEstonia
Total retail price (€/kWh)~€0.24~€0.26~€0.33~€0.32~€0.23
Energy/Supply cost~30-35%~40-45%~40-50%~55-65%~45-50%
Network/Grid fees~20-25%~15-20%~20%~15-20%~25-30%
Taxes & levies (incl. VAT)~41%~40%~20-25%~15-20%~25-30%

Behind-the-meter solar with 100% local consumption avoids grid fees and captures the full retail spread—this is why we target large rooftops (C&I, multi-residential, public buildings), not utility-scale farms.

Key takeaway: The technology works. The ownership and deployment model doesn't.


Slide 3: The Insight – A Proven Model, Enhanced

This problem is already solved in China, where C&I rooftop solar is widespread.

The Chinese model separates system ownership from building ownership and tenancy—a third party owns and operates the solar asset, while the building owner earns roof rent and the tenant buys cheaper green energy. Everyone benefits without complex negotiations.

We apply the same proven approach to European C&I rooftops, then add tokenization and a secondary market on top.

How We Solve Each Problem

ProblemIntelliShares Solution
1. Split-Incentive & FundingWe separate asset ownership from building ownership entirely. Building owners earn roof rent. Tenants buy cheaper energy. Global investors—including millions without roofs—own the asset through tokens. No balance sheet impact for property owners.
2. Geographic MismatchINT enables borderless ownership. A Swiss apartment dweller can fund Estonian solar that's 84× more effective at reducing emissions than Swedish solar—capital flows where impact is greatest.
3. Wholesale vs. Retail GapWe deploy behind-the-meter with 100% local consumption—capturing retail prices instead of wholesale. This is how we achieve up to 400% better economics than grid-connected solar farms.

What tokenization adds:

  • Fractional ownership – 1 Wp = 1 RWA token. A 500 kWp project becomes 500,000 tradeable shares, each paying a steady revenue stream.
  • Liquidity – Secondary market for RWA tokens (traditional C&I solar has none)
  • Global & instant – Value distribution to token holders worldwide, automatically
  • Accessibility – Anyone can participate; transaction costs are the only limitation

Slide 4: Operational Model – Behind the Meter

We deploy where economics are strongest and barriers are lowest.

Behind-the-Meter Advantage

ApproachGrid-Connected FarmBehind-the-Meter
Grid connection2–5 year wait, costly upgradesUse existing connection
Revenue startAfter grid approvalImmediate
Value captureWholesale export (€0.04–0.12/kWh)Retail savings (€0.23–0.33/kWh)
Economics~100% baselineUp to 400% better

We capture the value of avoided costs, not grid export—every kWh consumed on-site is worth 2–4× more than selling to the grid.

Solar + Battery: Maximum Self-Consumption

Battery storage maximizes self-consumption and unlocks additional revenue streams:

Revenue SourceDescription
Self-consumptionStore solar for evening/night use, capture full retail value
Peak shavingReduce demand charges for site owners
EV chargingPower on-site superchargers at peak rates
Backup powerProvide resilience where outages are costly
Grid servicesFCR, mFRR, and similar frequency/balancing markets

Turnkey Solution

IntelliShares provides complete operational management:

ServiceDescription
Asset operationOperated via our subsidiary IntelliWatt AB or contracted partners
AdministrationContracts, compliance, reporting
Invoicing & paymentsWeb3-native billing; INT payments have no exchange cost, stablecoins/fiat accepted with fees
Participant controlEach party manages their role within the IntelliShares economy

Circular economy: Tenants can own RWA tokens that generate INT payments—then use that INT to pay their energy invoices. The system feeds itself.

Deployment Principles

  1. Large roofs, large consumption – C&I, multi-residential, public buildings (50+ kWp)
  2. Existing grid access – No waiting for new connections
  3. Revenue before tokenization – Only tokenize assets already generating cash flow
  4. 100% local consumption – Maximize self-consumption, minimize grid dependency
  5. Risk reduction – Construction and regulatory risk materially lower

Result: Projects deploy faster, earn sooner, and carry less risk than traditional utility-scale development.


Slide 5: Business Model

Multiple revenue streams from one asset base

SourceRevenue StreamAsset
Energy SalesOn-site generation sold below retail, avoiding grid fees, energy tax, and VATSolar
Grid ServicesFrequency regulation (FCR), balancing (mFRR), arbitrageBattery
Peak ShavingReduce demand charges for site ownersBattery
Capacity & FlexibilityBackup power, demand response, capacity paymentsBattery
EV ChargingPower on-site chargers at premium ratesSolar + Battery
CO₂ CreditsVerified emission reductions (~€82/ton) passed to RWA token holdersSolar

Project mix varies—some sites are solar-only, some battery-only, many are combined.

Value to RWA Token Holders:

  • Net operating margin (after CAPEX, OPEX, roof lease, admin) flows to RWA holders
  • Target annual yield: 10–20% (varies by project)
  • Plus share of CO₂ credit revenue
  • Multiple revenue streams provide stability; geographic diversification reduces political/regulatory risk

Value to INT Token Holders:

  • INT is the only payment method for RWA purchases and revenue distributions—ecosystem growth drives demand from both sides
  • RWAs are priced in fiat but paid in INT; revenues generated in fiat are converted to INT for distribution
  • As INT appreciates, early holders buy RWAs at lower effective cost → better yields
  • Fixed supply (10B) + growing ecosystem = classic supply/demand upside

Slide 6: Project Economics – Solar Example

Kings Avenue Mall, Paphos, Cyprus 1,369 kWp rooftop solar (2,122 panels), 100% self-consumption

Project Overview

ParameterValue
BuildingShopping mall, 48,000 m²
Annual consumption14,400 MWh
Solar system2,122 panels × 645W
Solar capacity1,369 kWp
Solar generation2,125 MWh/year
Self-consumption100% (generation << consumption)
CO₂ avoided1,137 tons/year (Cyprus: 535 gCO₂e/kWh)

Annual Revenue

StreamCalculationAmount
Energy sales2,125 MWh × €209/MWh€444,229
CO₂ credits1,137 tons × €82/ton€93,234
Total revenue€537,463

Energy price: 5% discount from mall's grid cost (€0.22/kWh ex-VAT)

Annual Costs

ItemCalculationAmount
CAPEX amortization€1,094,952 ÷ 25 years€43,798
OPEX & maintenance2% of CAPEX€21,899
Roof lease5% of revenue€26,873
Total costs€92,570

RWA Token Economics

MetricValue
Total RWA tokens1,368,690 (1 per Wp)
Token price€2.17 (priced at 15% target yield)
Annual yield per token€0.325 (15%)
Net margin to RWA holders€444,893/year
25-year total return€11.1M

Who Benefits – Annual Value Created

StakeholderBenefitAnnual Value
Energy Consumer (Mall)5% electricity savings vs. grid€23,375
Building OwnerRoof lease (5% of revenue)€26,873
RWA Token HoldersNet operating margin + CO₂ credits€444,893
ClimateCO₂ emissions avoided1,137 tons

IntelliShares earns a one-time development margin of €1.88M (difference between €2.17 token price and €0.80 build cost per Wp).

What This Means for Each Participant

  • Mall tenant: Pays €23k less per year for electricity—same power, lower bill, 100% green
  • Building owner: Earns €27k/year for roof access—no investment, no risk, passive income
  • RWA investor: Invests €2,170 (1,000 tokens) → earns €325/year (15% yield)
  • IntelliShares: Funds €1.1M build, sells €2.97M in tokens, deploys capital to next project
  • Climate: 1,137 tons CO₂/year avoided—equivalent to taking 247 cars off the road or planting 52,000 trees

Slide 6b: Project Economics – Battery Example

BRF Innovationen, Norra Tornen, Stockholm, Sweden (SE3) 550 kW / 1.1 MWh Battery-as-a-Service replacing diesel backup

Project Overview

ParameterValue
BuildingBRF Innovationen, Norra Tornen, Stockholm
ReplacedDiesel backup generator
Battery system550 kW / 1.1 MWh
Backup reserve160 kW / 360 kWh
Grid servicesRemaining 740 kWh — frequency balancing (weighted toward up-regulation)
Connection800A

A second facility at the other North Towers building is a future possibility, not a current commitment.

The BaaS Advantage

IntelliShares provides backup power at no upfront cost to the building owner. In return, we gain:

  • Zero space cost – battery replaces diesel in existing generator room
  • Zero grid connection cost – use the existing 800A connection
  • Asynchronous capacity – normal load leaves headroom in both directions for grid services

Revenue Model – Three Scenarios

Scope: modeled at full build-out (both towers). The figures below assume both North Towers buildings are equipped — the same battery system installed twice. A second facility remains possible, not promised; today only one (BRF Innovationen, 550 kW / 1.1 MWh) is confirmed.

Grid service prices vary significantly. We show three scenarios based on actual SE3 mFRR CM data:

ScenariomFRR UpmFRR DownBasis
Conservative€13/MW/h€3/MW/hDecember 2025 (lowest month)
Moderate€25/MW/h€10/MW/hWinter average
Annual Average€43/MW/h€19/MW/hFull year 2025

Fixed Revenue (all scenarios):

ServiceAmount
BaaS fee€23,544

Grid Services Revenue (mFRR + FCR-N stacked):

mFRR and FCR-N can be bid simultaneously on the same capacity. FCR-N is symmetric, limited to 620 kW.

ScenariomFRR UpmFRR DownFCR-NTotal Revenue
1.1 MW0.4 MW0.62 MW
Conservative€125,268€10,512€81,468€240,792
@€13/MW/h@€3/MW/h@€15/MW/h
Moderate€240,900€35,040€108,624€408,108
@€25/MW/h@€10/MW/h@€20/MW/h
Annual Avg€414,348€66,576€146,642€651,110
@€43/MW/h@€19/MW/h@€27/MW/h

Prices: mFRR from SE3 2025 data, FCR-N from nationwide 2025 data. Conservative uses lowest month.

Annual Costs (Fixed)

ItemCalculationAmount
CAPEX amortization€683,064 ÷ 15 years€45,538
OPEX & maintenance2% of CAPEX€13,661
Space & gridIncluded in BaaS€0
Total costs€59,199

Scenario Comparison

ScenarioTotal RevenueNet MarginYield at €1.10
Conservative€240,792€181,59315%
Moderate€408,108€348,90929%
Annual Average€651,110€591,91149%

RWA Token Economics (Priced on Conservative)

MetricValue
Total RWA tokens1,100,000 (1 per W)
Token sale price€1.10 (15% yield on conservative case)
Net margin (conservative)€181,593/year
Net margin (annual avg)€591,911/year
15-year return (conservative)€2.72M
15-year return (annual avg)€8.88M

Token priced at 15% yield on the conservative scenario. Upside from higher grid service prices flows directly to RWA holders.

Who Benefits – Annual Value Created

StakeholderBenefitConservativeUpside (Annual Avg)
Building OwnerModern backup, no diesel€23,544€23,544
RWA Token HoldersNet operating margin€181,593€591,911
Grid (Svenska Kraftnät)Frequency regulation1.1 MW + 0.62 MW1.1 MW + 0.62 MW
ClimateDiesel eliminatedNo emissionsNo emissions

IntelliShares earns a one-time development margin of €527k (€1.10 − €0.62 per token × 1.1M tokens).

What This Means for Each Participant

  • Building owner: Replaces aging diesel with modern battery backup—no cost, no maintenance, no fuel
  • RWA investor: Invests €1,100 (1,000 tokens) → earns €165–538/year (15–49% yield depending on grid prices)
  • IntelliShares: Funds €683k build, sells €1.21M in tokens, provides grid stability services
  • Grid operator: Gains 1.1 MW mFRR + 0.62 MW FCR-N capacity for frequency regulation
  • Climate: Two diesel generators permanently retired

The token is priced for 15% yield on the lowest month of 2025. Historical data suggests significantly higher returns are likely.


Slide 7: Deployment Strategy

Prove it. Scale it. Expand it.

Phase 1: Sweden – Proof of Concept

We start in Sweden because we know the market, not because it offers the highest returns or CO₂ impact.

Why Sweden First
Local expertiseExisting subsidiaries (IntelliWatt, IntelliRay), established relationships
Stable regulationPredictable environment to prove the model
Mature grid servicesTransparent mFRR/FCR markets with real price data
FocusBaaS projects + solar with 100% self-consumption

Sweden's grid is already clean (7 gCO₂e/kWh)—CO₂ credits are negligible here. This phase is about proving economics and operations.

Phase 2: High-Impact Europe – This Is Where IntelliShares Makes an Impact

Once proven in Sweden, we expand to high-carbon European markets where every kWh makes a real difference.

MarketGrid Carbonvs. SwedenRetail Price
Estonia585 gCO₂e/kWh84×~€0.23/kWh
Poland554 gCO₂e/kWh79×~€0.26/kWh
Cyprus535 gCO₂e/kWh76×~€0.32/kWh
Italy213 gCO₂e/kWh30×~€0.33/kWh
Greece275 gCO₂e/kWh39×~€0.28/kWh
Spain117 gCO₂e/kWh17×~€0.21/kWh

Expansion triggers:

  • Proven unit economics in Sweden
  • Operational track record
  • Repeatable deployment playbook
  • Local partner or subsidiary established

Phase 3: Africa & Asia – Beyond the Grid

Expanding to emerging markets where grid infrastructure cannot meet current demand.

New CapabilityDescription
MicrogridsBuild complete energy systems where the grid doesn't reach
Local grid operatorBecome the utility for small communities
Leapfrog infrastructureSkip centralized grids entirely—go straight to distributed renewable

In regions without reliable grid access, we don't just deploy behind the meter—we become the grid.

Capital protection first. Growth second.


Slide 8: Traction & Current Status

Building real momentum toward global launch

Completed

MilestoneDetails
IntelliShares SA FoundedSwiss company established with 100,000 CHF share capital, headquartered in Lugano
FINMA No Action LetterTokenization model confirmed by Switzerland's financial regulator
Tokenomics PartnershipEngaged Brightnode (Swiss tokenomics firm) for complete tokenomics review, token model refinement, and whitepaper review
Legal PartnershipEngaged Lexify for regulatory setup including SRO membership, AML/KYC compliance, and FINMA matters

Active

MilestoneDetails
Platform DevelopmentProduct and platform under development for proof-of-concept release Q1–Q2 2026
KYC/AML SystemsCompliance procedures and support systems live
SAFT Pre-SalePre-ICO process incentivizing early adopters and building community
Global Marketing CampaignPartnered with RZLT, a Web3 marketing agency, for crypto-native and traditional market outreach

In Progress

MilestoneDetails
So-Fit SRO affiliationSo-Fit, a FINMA-recognised self-regulatory organisation, granted pre-approval in August 2026; formal membership is pending. Bank-grade KYC/AML enables INT as a payment token and fiat exchange
EU MiCA ComplianceWorking toward approval under EU's Markets in Crypto-Assets regulatory framework
Web3 DevelopmentToken infrastructure development on Solana—INT and RWA token contracts, wallet integration, distribution mechanisms
First Tokenized ProjectsInitial projects in planning in Stockholm, Sweden

Pipeline

MilestoneDetails
Exchange Listing TalksPreliminary discussions with centralized exchanges for future INT listing
EU Climate AcceleratorsEvaluating cooperation with Interreg South Baltic, Horizon Europe, and EIT InnoEnergy / EIT Climate-KIC
Installer Network OutreachEngaging solar installers across EU to establish global go-to-market distribution
2026 Global FundraisingTargeting multiple rounds throughout 2026, starting at €5M and scaling progressively

Key Metrics

MetricValue
Capital raised to date€232,000
Project pipeline identified~50 MW (initial scope)
EU C&I rooftop potential519 GWp

Pipeline Reality

As solar developers, we've encountered numerous projects with ideal conditions—good roofs, existing grid connections, strong local consumption—but the building owners won't invest. Why? The split-incentive problem we're solving.

This is why we started IntelliShares.

Our pipeline isn't limited to our own deal flow:

  • Sweden: Several identified multi-MW grid connections for large-scale BaaS
  • Our network: Projects we couldn't close as traditional developers—now solvable
  • Every installer in EU: We solve the same problem for every solar installer who loses deals to split incentives

The constraint isn't finding projects. It's capital to deploy.


Slide 9: Team

Paul Wisén – CEO & Founder

Started his career in 1998 as a Research Engineer at Vattenfall Research and Development in Sweden. Serial entrepreneur with 25+ years building companies across IT, telecom, solar, and blockchain. Founded and operates IntelliWatt AB and IntelliRay AB in Sweden. Green energy and crypto enthusiast who recognized the intersection of renewable infrastructure and blockchain as the catalyst for IntelliShares.

LinkedIn

Pelle Stensson – Founder

CEO of IntelliWatt AB and IntelliRay AB, IntelliShares' Swedish subsidiaries. Combines startup leadership with commercial aviation experience as a pilot for Norwegian Airlines—bringing operational discipline and systems thinking to infrastructure deployment. Special interest: tokenizing ownership of future electric aircraft fleets.

LinkedIn

Stefan Huszics – CTO

50 years old with deep technical knowledge from the solar and green energy industry. External technical provider working with IntelliShares and KomByggSol AB. Brings decades of hands-on experience in large-scale solar system design and energy infrastructure.

LinkedIn

Christofer Klint – Head of Strategy & Architecture

Designed IntelliShares' communication architecture — the frameworks connecting 100+ infrastructure projects to a legible brand and participation narrative. Runs market positioning, content systems, and the operating logic that makes a complex organisation understandable. Background: 16 years scaling a 200M SEK operation — 500-person teams, 5,000+ hires.

LinkedIn

Kaito Masaki – Lead Developer

Full-stack and blockchain engineer with 8+ years of experience. Based in Tokyo. Builds the technical infrastructure connecting smart contracts, platform systems, and real-world asset verification. Background in tech leadership and open-source contribution.

LinkedIn

Board & Advisors

Brandon Ahearn – Chairman of the Board JurDr, LLM, Lawyer – Global Legal and Business Advisory, Lugano, Switzerland. Extensive legal expertise supporting IntelliShares' tokenized solutions development. Strong background in international business and law, providing strategic insights for regulatory compliance and corporate governance.

LinkedIn


Slide 10: Competitive Positioning

Why We Win

AdvantageDescription
Democratized CapitalOpen investor access, aligned incentives—no VC exit pressure demanding unrealistic returns
Impact-Optimized DeploymentCapital flows where CO₂ reduction is up to 84× higher—attracts both yield-seekers and ESG investors
Behind-the-Meter EconomicsUp to 400% better returns vs grid export, storage-first revenue, reduced political/regulatory risk
Installers as DistributionWe fund what they sell—solves landlord-tenant deadlock, turns installers into global sales network
Infrastructure DNAYears building real energy systems—blockchain as tool, not product

Slide 11: INT Token – The Foundation of Our Economy

INT is the mandatory payment asset for all RWA subscriptions and IntelliShares services.

Every participant who wants ownership of green energy assets must convert fiat into INT. This creates demand tied to real activity, not speculation.

Three Demand Drivers

DriverDescription
Functional DemandINT is required to purchase any RWA token—no exceptions
Revenue ConversionAll RWA revenues generated in fiat are converted to INT at market value for distribution—more RWAs, more INT demand
Strategic AccumulationEarly holders secure predictable access to limited-capacity RWA cycles at fixed subscription prices

Token Characteristics

AttributeValue
Total Supply10,000,000,000 (fixed, pre-minted)
BlockchainSolana (SPL Token)
InflationNone—supply is capped
ClassificationPayment token (NOT a security)

What INT Is Not

  • INT does not generate yield by itself
  • INT carries no profit-sharing or voting rights
  • Returns come from RWA ownership, not from holding INT

Early-Mover Advantage (SAFT)

  • Access to pre-TGE pricing (€0.0012–€0.0024 in Pre-sale 1)
  • Priority access to first RWA project allocations
  • Positioned before exchange listings create broader demand

Full tokenomics: Tokenomics


Slide 12: Cyclical Token Economy

INT operates within a dual-cycle system that expands and contracts based on real project demand.

The Two Cycles

CycleWhat HappensSupply Effect
Funding CycleTreasury releases INT to raise capital for new projectsSupply expands
Project CycleCustomers use INT to purchase RWA tokens; INT returns to treasurySupply contracts

How It Works

        ┌─────────────────────────────────────┐
        │           TREASURY                  │
        │    (Operational Balance Sheet)      │
        └──────────────┬──────────────────────┘
                       │
       ┌───────────────┴───────────────┐
       ▼                               │
 ┌───────────┐                         │
 │  Funding  │  INT released           │
 │   Cycle   │  to raise capital       │
 └─────┬─────┘                         │
       ▼                               │
 ┌───────────┐                         │
 │  MARKET   │  Customers              │
 │           │  acquire INT            │
 └─────┬─────┘                         │
       ▼                               │
 ┌───────────┐                         │
 │  Project  │  INT used to            │
 │   Cycle   │  purchase RWA           │
 └─────┬─────┘                         │
       │                               │
       └───────────────────────────────┘
              INT returns to treasury

Why This Creates Sustainable Demand

  • Fixed supply + growing asset base = increasing demand for INT
  • Treasury acts as an operational balance sheet, not a passive reserve
  • Each successful RWA cycle strengthens treasury dominance
  • Cycles can run in parallel as new projects continuously originate

Treasury Objectives

  1. Maximize INT returning to treasury through RWA sales
  2. Maintain treasury dominance (hold more INT than circulating supply)
  3. Self-sustaining cycles that don't depend on speculative demand

Downside protection: Projects can still be financed via equity or traditional project finance if token liquidity is constrained.


Slide 13: Fundraise & Next Milestone

Sale Rounds Summary

RoundINT Sold% of SupplyEUR TargetAvg €/tokenStatus
Pre-sale 1 – Platform500,000,0005.00%€900,000€0.0018◀ CURRENT
Pre-sale 2 – Proof of Concept500,000,0005.00%€3,600,000€0.0072Upcoming
Public 1 – RWA Projects1,200,000,00012.00%€22,924,800€0.0191Future
Public 2900,000,0009.00%€18,912,960€0.0210Future
Public 3800,000,0008.00%€18,492,672€0.0231Future
Public 4600,000,0006.00%€15,256,454€0.0254Future
Total4,500,000,00045.00%€80,086,886

Pre-sale instrument: SAFT (Simple Agreement for Future Tokens)

Note: The current round shown above may have changed. Visit intellishares.io for the latest pricing and availability. Pre-Sale 1 will close upon receipt of SRO approval.

Use of Funds

Capital allocated to deploy revenue-generating assets, complete regulatory readiness, and operationalize the IntelliShares platform.

Funds are deployed to create new RWA capacity, not to subsidize yield or token value.

CategoryUse
1. Asset Deployment (Primary)Behind-the-Meter Solar & Battery
Initial projects in Sweden (Phase 1)
CAPEX, EPC, and on-site infrastructure
Legal structuring (SPV where required) and asset tokenization
2. Platform & Token InfrastructureRWA & INT Enablement
RWA issuance and lifecycle management
INT payment and settlement logic
Platform PoC → production
3. Regulatory & ComplianceSwiss & EU Readiness
SRO membership (KYC/AML)
MiCA compliance workstream
Legal structuring & advisory
4. Operations & Market EntryExecution Readiness
Local operators and partners
Asset monitoring and reporting
Phase 2 (EU) market preparation

Each deployment expands RWA capacity and drives structural INT demand.

What Pre-Sale Participants Get

  • Early pricing – 8–20× lower than projected public round prices
  • Priority access – First allocation rights to RWA project tokens
  • Community status – Early adopter recognition and involvement

Value Inflection Point

Pre-sale 2 funds the first operational assets generating real cash flow—the moment IntelliShares transitions from concept to revenue.

Total fundraising target: €80M across all rounds, funding a multi-GW pipeline of green energy projects.


Appendix: Data References

Carbon Intensity (High-Impact Regions)

CountrygCO2e/kWhvs. SwedenSource
Cyprus53576xEEA 2024
Poland55479xEEA 2024
Germany29843xEEA 2024
EU-27 Average18727xEEA 2024
Sweden71x (baseline)EEA 2024

Token Allocation Summary

CategoryAllocation
Treasury32%
Public Rounds35%
Team (36-mo vesting)10%
Pre-sales10%
Liquidity7%
Marketing & Advisors6%
  • Whitepaper – Full project vision and technical details
  • Tokenomics – Complete token economics and sale structure

IntelliShares SA is registered in the Swiss commercial register. IntelliShares SA has been affiliated with So-Fit since 29 October 2026 and is audited annually under the Swiss Anti-Money Laundering Act. So-Fit is a self-regulatory organisation approved by the Swiss Financial Market Supervisory Authority (FINMA) for the supervision of financial intermediaries referred to in Article 2 paragraph 3 of the Swiss Federal Act on Combating Money Laundering and Terrorist Financing in the Financial Sector (Anti-Money Laundering Act, AMLA).

SO-FIT est un organisme d'autorégulation agréé par l'Autorité fédérale suisse de surveillance des marchés financiers (FINMA) pour la surveillance des intermédiaires financiers visés à l'article 2 al. 3 de la Loi fédérale suisse concernant la lutte contre le blanchiment d'argent et le financement du terrorisme dans le secteur financier (LBA).

More on supervision and status

IntelliShares SA, Agno/Lugano, CHE-445.664.428.

© 2026 IntelliShares SA. All rights reserved.

Swedish is the authoritative version. The English has been reviewed and the other languages are AI-translated.